10 November 2007. A meeting of minds in the diesel shed. |
10 November 2007. Bailey inspects the progress of the ramp. |
10 November 2007. David, Jed and Ross enjoying a lighter moment. |
10 November 2007. Stephen and Callum hard at work building a new ramp in the diesel shed. |
10 November 2007. The "Ratfish" multi purpose mixing trolley in use for concreting the base of the pit in the diesel shed. |
15 December 2007. A man and a Cobra |
15 December 2007. The creation of a ramp in the shed up to the new concrete floor. |
16 December 2007. A progress photo of the platform extension. |
16 December 2007. An impressive goods train. |
16 December 2007. Ramp no more. |
16 December 2007. The raw materials for the platform stone facing. |
2 December 2007. A warflat of 60 foot rails. |
25 November 2007. A shortage in under cover accommodation calls for creative measures to continue overhaul. |
25 November 2007. All these 60 foot rails were lifted onto a wagon to allow access to the platform extension work area. |
25 November 2007. An artistic shot. |
25 November 2007. Molly inspects the new entrance ramp at the diesel shed. |
25 November 2007. Night lifting. |
25 November 2007. The site of soon to be extended platform, with the siding just lifted. |
25 November 2007. The transformation of a coal wagon. |
7 October 2007. The exposing of the former footbridge foundations. To allow cutting down to remove the trip hazard. |
7 October 2007. The painting and redecking of a well wagon. |
9 December 2007. A view of the station taken from Bog Road bridge prior to the first Santa Special train. |
9 December 2007. At the start of the first Christmas operting day the coaches await the locos. The early stages of the platform extension can be seen. |
9 December 2007. The early stages of the Brechin platform extension which will increase the capacity to 8 coaches. |
| | | |