1 March 2008. Harlaxton, jacked up in shed for repair. Whilst the wheels are out the frame is being repainted. Removal of built up crud and loose paint underway. |
1 March 2008. The new extended platform. |
1 March 2008. The platform extension is nearing completion. |
10 February 2008. A photo taken at the start of the day before the scene was cluttered. All the timbers are in place ready for more drilling and rail aligning |
10 February 2008. The fading light and rail cutting produced this spectacle - caught on my phone. |
13 January 2008. Following levelling by JCB the previous day, the ground is ready for track laying. |
13 January 2008. Progress with the new siding "Road 1B" |
13 January 2008. The crane sitting on newly laid plain line track. |
13 January 2008. The crane sitting on newly laid plain line track. |
13 January 2008. The scene on the ground, where the point will go. |
16 March 2008. A fun job, each timber has to be packed tight with ballast, here electric |
16 March 2008. Ballast packing works. |
16 March 2008. Final ballasting complete and spreading nearing conclusion |
16 March 2008. The Bridge of Dun approach. |
17 February 2008. BBR = Balfour Beatty Rail, this will fit in amongst BR 1960s chairs. |
17 February 2008. New chairs bought from Balfour Beatty Rail and cast this year - wow! |
17 February 2008. The point taking shape |
2 March 2008. 26014 from a distance. |
2 March 2008. A p-way bogie viewed from a distance. |
2 March 2008. Road 1B progress. |
2 March 2008. Teamwork on the concrete sleepers. |
2 March 2008. The point, with all the rails connected up. |
24 February 2008. A view of the metalwork from the road bridge. |
24 February 2008. A view of the worksite through the zoomed camera. |
| | | |