23 September 2007. After a rare day of good weather the jib gets the first paint with top coat.
23 September 2007. After a rare day of good weather the jib gets the first paint with top coat.
23rd September 2007
Crane Overhaul 2007
Caledonian Railway Photographs @ fotopic.net
23 September 2007. A potential final colour scheme for the crane. Mean while the engine has been installed with connections ongoing.Previous | Next25 November 2007. The first outing for the mechanically overhauled crane. Still a bit of painting to be done though.